Block-modular boiler room as a part of fuel gas treatment facility for the power supply complex of Kharasavey field
Designed for: treatment of the heat carrier for gas preheating unit
Version: separate block-box integrated into a common module
Number of boilers: 2
Type: water-heating
Useful thermal capacity: 0.6 MW (total)
Commissioning: October 2021
Customer: LLC Allocation Hub (for JSC Gazstroyprom / PJSC Gazprom)
Gas type:
Natural gas