Multi-unit gas distribution station for the Novolenskaya TPP
Number of units: 1 process complex (6 separated block-modules included)
Designed for: filtration, heating, pressure reducing, and parameters control of gas
Version: various (on open frame and in their own enclosures)
Inlet pressure: 1.8…4.7 MPa
Outlet pressure: 1 MPa
Throughput: 166,000 m3 / h
Commissioning: scheduled for 2028
Customer: JSC Inter RAO - Electric Power Plants
Gas type:
Natural gas
