End system of gas filtration as part of the fuel treatment system for the peak GTPP-100MW at Novopolotsk CHPP

Designed for: ultra-fine purification of gas
Version: on open frame (with roof from rainfall)
Throughput: 29,780 m3 / h (design) / 59,560 m3 / h (maximum)
Number of filters: 4
Type: vertical cartridge (single-stage coalescing)
Efficiency: 99,9% for particles larger than 0,01 microns
Residual impurity content: 0.001 ppmw (mg / kg)
Commissioning: project was completed with the delivery of filtration system to the facility
Customer: Siemens Energy AB (for RUE Vitebskenergo)
Gas type:
Natural gas