End system of gas filtration as part of the fuel treatment system for the peak GTPP-100MW at Novopolotsk CHPP

Designed for: ultra-fine purification of gas

Version: on open frame (with roof from rainfall)

Throughput: 29,780 m3 / h (design) / 59,560 m3 / h (maximum)

Number of filters: 4

Type: vertical cartridge (single-stage coalescing)

Efficiency: 99,9% for particles larger than 0,01 microns

Residual impurity content: 0.001 ppmw (mg / kg)

Commissioning: project was completed with the delivery of filtration system to the facility

Customer: Siemens Energy AB (for RUE Vitebskenergo)