Booster compressor station as a part of the gas treatment system for the GTU-91.2MW of Yuzhno-Sakhalinsk CHPP-1 (5-th power generating unit)

Number of units: 2

Designed for: treatment and feeding fuel gas into turbines

Version: container (with two-stage compression)

Inlet pressure: 0.25 MPa

Outlet pressure: 5 MPa

Capacity: 14,300 m3 / h (unit)

Commissioning: August 2012

Customer: LLC Sakhalin Company "Energostroy" (for PJSC "Sakhalinenergo")