Multiblock fuel gas treatment facility for the GTPP and facilities of CGCTP at East-Urengoy licensed area

Number of units: 2 modules (8 block-boxes in composition)

Designed for: gas filtration, metering, heating and reducing

Version: multiblock (with common roof)

Inlet pressure: 3.9…8 MPa (module No.1) / 3.9...8.1 MPa (module No.2)

Outlet pressure: 0.6...3.5 MPa (module No.1) / 0.6...3.2 MPa (module No.2)

Capacity: 93...90,400 m3 / h (module No.1) / 93...32,612 m3 / h (module No.2)

Commissioning: March 2019 (module No.2) / module No. 1 commissioning scheduled for IV quarter of 2019

Customer: JSC "RN-Snabzheniye" (for the JSC "ROSPAN INTERNATIONAL" / PJSC "NK "Rosneft")

News on the project