Booster compressor station as a part of the gas treatment system for the GTU-CHPP of Yarega field (power supply complex "Yarega")

Number of units: 4

Designed for: treatment and feeding fuel gas into turbines

Version: arctic

Inlet pressure: 0.55…0.9 MPa

Outlet pressure: 4.5…5 MPa

Capacity: 10,770 m3 / h (unit)

Commissioning: July 2017

Customer: LLC "LUKOIL-Energoengineering" (for the LLC "LUKOIL-Komi")