Associated gas treatment unit as a part of the gas treatment system for the GTU-CHPP of Usinsk field (power supply complex "Usa")

Number of units: 1

Designed for: gas filtration, separation, metering, heating and reducing

Version: in easy-to-assemble enclosure

Inlet pressure: 1.4…2.5 MPa

Outlet pressure: 0.1 MPa (per boiler station) / 1.3…2.5 MPa (per gas compressor station)

Capacity: 24,059 m3 / h (265 m3 / h for boiler station; 23,794 m3 / h for GTU)

Commissioning: June 2016

Customer: LLC "LUKOIL-Energoengineering" (for the LLC "LUKOIL-Komi")