Block-modular boiler room as a part of fuel gas treatment facility for the power supply complex of Barsukovskoye field

Designed for: treatment of the heat carrier for gas preheating unit

Version: separate block-box integrated into a common module

Number of boilers: 2

Type: water-heating

Useful thermal capacity: 0.19 MW (total)

Commissioning: July 2019

Customer: LLC Alliance Generation (for LLC RN-Purneftegaz / PJSC NK Rosneft)