Press-center

The ENERGAS Group has completed 66th project in the treatment and compression of associated petroleum gas

8 April 2019

At the site of the compressor station of low stages of South-Vatlor field (the BPS area), there are operate two booster compressor units of the company ENERGAS. These BCUs are designed for pumping associated petroleum gas of the first separation stage coming from the booster pump stations of the following fields of PJSC Surgutneftegas: South-Vatlor, Vatlor, Suryogan, Verkhnekazymskoye, field named after I.N. Logachev.

The units, created on the basis of screw oil-filled compressors, continuously implement a final purification, compression and feeding of APG to the external gas pipeline at pressure of 2.2 MPa. The capacity of each BCU is 10,000 m3 / h.



Packaged units in arctic version are designed taking into account the extreme operating conditions (minimum air temperature is minus 55°C, average air temperature of the coldest five-day period is minus 43°C).

BCUs are completely automated; they are equipped with life support systems (heating, ventilation and lighting) and safety systems (fire detection and fire fighting, gas detection, alarm).

This project has become the sixty-sixth for the companies of the ENERGAS Group in the treatment and compression of associated petroleum gas. At present, 70 process units operate at gas collection and transportation facilities, 74 more treat APG as fuel for autonomous power supply complexes of the fields.

Previous news Back to the list Next news