Block-modular boiler room as a part of fuel gas treatment facility for the power supply complex of Kharasavey field

Designed for: treatment of the heat carrier for gas preheating unit

Version: separate block-box integrated into a common module

Number of boilers: 2

Type: water-heating

Useful thermal capacity: 0.6 MW (total)

Commissioning: October 2021

Customer: LLC Allocation Hub (for JSC Gazstroyprom / PJSC Gazprom)

News on the project